外國投資者在越南值得信賴的合作伙伴

門窗、欄杆與衛浴設備

鋁合金門窗安裝

安裝縫隙規定、門窗搬運,從洞口測量、框體調平固定、發泡膠填縫到玻璃安裝和打膠的七個步驟,以及常見錯誤。

  • World Steel Group
  • 釋出於
  • 閱讀約 7 分鐘
鋁合金門窗安裝
本文內容
  1. General rules
  2. Handling the units
  3. Installation sequence
  4. Care
  5. Common mistakes
  6. Reference standards

本文內文為英文版,繁體中文譯文正在準備中。

Aluminium-and-glass doors and windows, and steel-reinforced uPVC units, decide how watertight and quiet the facades of office blocks, control buildings and canteens are. World Steel installs them in a fixed sequence: survey of the openings, setting and levelling the frame, fixing, foam filling, glazing and hardware, then silicone, with two acceptance points for the supervising consultant, at the frame and at completion.

鋁合金門窗安裝, 圖 12

General rules

  • Installed before the opening is finished (unplastered): leave a 4–7 mm gap (usually 5 mm) between wall and frame for expanding foam, then plaster up to the frame.
  • Installed in a plastered opening: 4–7 mm gap (usually 5 mm); after foaming, trim the excess at an angle and finish.
  • Installers are trained in safety, product properties and standards, the installation procedure, reading drawings, using hand tools, and storing and handling loose parts (frames, glass, beads).
  • Tools: concrete drill and bits, screw gun, plastic mallet, sealant gun, hex keys, spirit level, laser, tape measure.

Handling the units

  • Never push a carrying pole through the frame or leaf; carry units upright, never flat.
  • Stack them on purpose-made racks and strap them so they cannot move.
  • Never rest or rub aluminium faces against hard objects or sharp edges, never knock frame corners on the floor; put soft packing between units and between units and walls or floors.

Installation sequence

StepWorkControl
1. SurveyCheck the area and the openings for height, width, diagonals and wall lean; align window axes between floors and between windows on the same floor; check whether bringing the units in will affect other work.Record of opening dimensions.
2. Setting the frameSet the frame in the opening on packers so it is level, at the correct distance from the wall face.Laser, spirit level, tape measure.
3. Drilling and screwsDrill 10 mm holes in the concrete, keeping the bit square to the wall; near wall edges, watch the drilling direction so the edge does not break. Put screws in the first holes without fully tightening them.Screws 10–15 cm from frame corners or mullion joints; no screw exactly between a mullion joint and a frame corner.
4. Levelling and fixingLevel inside to outside, then left to right, with packers while gradually tightening the screws; drill and fix the remaining screws; tighten all.Equal diagonals, frame not racked and not squeezed by the wall.
5. Foam fillingFill the full length of the gap with expanding foam; gaps wider than 5 mm are packed with sand-cement mortar. Trim the foam when it is dry.Frame accepted by the supervising consultant.
6. Glass, leaves, hardwareHang and adjust the leaves; cap the screws and seal the screw holes on the bottom rail; glaze the fixed lights (short beads first, long beads bent in last); fit handles and locks.Smooth operation, even gaps round the leaves.
7. Silicone, handoverApply the finishing silicone; peel the protective tape outside first, then inside; clean and hand over.Even, continuous silicone bead.

鋁合金門窗安裝, 圖 21

Care

  • Frames: wipe with a clean damp cloth; use a mild cleaner (neutral soap) for stains; no coloured cloths that may stain the frame.
  • Glass: soft paper or a clean cloth with glass cleaner.

Common mistakes

MistakePrevention
Uneven silicone bead, sealant on finished wallsMask both sides of the joint; seal after final painting or protect carefully
Paint on silicone because sealing came before paintingSchedule sealing after painting
Large gaps at the beadsCheck bead sizes and fit them in sequence
Leaf distorted, large gap when closedAdjust hinges and leaf gaps before acceptance
Fixing screws not fully tightenedCheck the number of screws at frame acceptance
Frame made to the wrong sizeMeasure the actual openings before fabrication

Reference standards

The edition in force when the contract is signed applies.

  • TCVN 9366-2:2012 Doors and windows – Part 2: Metal doors and windows
  • TCVN 7505:2005 Code of practice for application of glass in buildings – Selection and installation

標籤

  • construction-method
  • windows
  • fit-out
  • facade

分享