Facility types

  • Enterprise data centres
  • Colocation data centres
  • Server rooms in industrial plants

Sample data This content is sample data and will be replaced by the approved copy.

02Specific challenges

  1. 01

    Redundant power and cooling

    MEP is most of the value and drives the facility’s reliability.

  2. 02

    Heavy equipment loads

    Floors and structure must carry racks, generators and cooling plant.

  3. 03

    Integrated commissioning

    A staged test and commissioning plan is needed before handover.

03Contracting scope

World Steel delivers Data centers projects turnkey, or any part of them the investor needs.

See the 6 turnkey stages
  • Project legal advice
  • Design: concept, basic, technical, construction drawings
  • Permits: environment, fire safety, building permit
  • Steel structures, frames and envelope made at the Hai Son factory
  • Construction: infrastructure, building works, installation, MEP
  • Completion and handover

04Technical control points

  • Redundant MEP

    Redundancy checked against the investor’s required tier.

  • Integrated commissioning

    Staged commissioning plan for power and cooling.

  • Welding quality

    Welding procedures and welders controlled to ISO 3834-2.

  • Steel fabrication

    Fabricated at the Hai Son factory to EN 1090-2 EXC3 or AS/NZS 5131 CC3.

05Vietnamese codes and investor standards

TopicVietnamese code / standardCommon investor standards
Fire safetyQCVN 06:2022/BXDNFPA, FM Global (as required by the investor’s insurer)
Steel structure designTCVN 5575EN 1993 (Eurocode 3), AISC 360, AS 4100
Loads and actionsTCVN 2737EN 1991, ASCE 7, AS/NZS 1170
Steel fabrication and weldingProject technical specificationEN 1090-2, AS/NZS 5131, ISO 3834-2, AWS D1.1
Data centre infrastructure—TIA-942, Uptime Institute Tier

For reference only; the codes that apply are agreed in each project contract.

06Case study

Challenge

[...]

Solution

[...]

Result

[...]

A case study with real figures will be added from the project portfolio.

07Downloads

Company profile, technical documents and certificates for this sector.

World Steel Group company profile

[...] Content is being prepared.

08FAQ

Does World Steel deliver data centers projects turnkey, from legal work to handover?

Yes. World Steel works in 6 stages under one contract: legal advice, design, permits, steel fabrication, construction, and completion and handover.

Can we contract only part of the work?

Yes. Investors can contract design, steel structures and PEB, MEP, or construction to an existing design as separate packages.

Which standards does World Steel work to?

Vietnamese codes plus the investor’s standards (Eurocode, AISC, AS/NZS…). The steel factory is certified to EN 1090-2 EXC3, AS/NZS 5131 CC3 and ISO 3834-2.

09Sector experts

  • [...]

    Expert in charge of Data centers

10Project consultation

Advice on your Data centers project

Send us the site, size and target dates; our sector expert will reply with a proposed scope and roadmap.

Fields marked * are required.

Your details are used only to answer this request and are stored encrypted.