Centrally run city · Northern Vietnam
Investing in Hai Phong
Industrial parks, gateways and World Steel Group projects in Hai Phong, within the boundaries in force since 1 July 2025.
Key facts
- Administrative unit
- Centrally run city, Northern Vietnam
- Merged from
- Hải Phòng, Hải Dương
- Industrial parks (reference)
- 41 parks
- Special-class and class-I seaports
- Hải Phòng seaport (Special class)
- International airports
- Cát Bi Airport
Gateways
Industrial parks in Hai Phong
The industrial park list for Hai Phong is being compiled.
Track record
World Steel Group projects in Hai Phong
-

In Vietnam
Sheng Long Biotech (Hai Duong) Factory
-

In Vietnam
Hai Duong Tongwei Animal Feed Factory
Packaged solutions
Turnkey solutions for a project in Hai Phong
One contractor from site selection, design, steel structure and construction to MEP and handover, shaped to each industry.
-
FDI factories
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
Logistics and cold storage
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
High-rise buildings
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
Data centers
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
Energy
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
Infrastructure
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
Commercial buildings
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
-
Agriculture and food
- Project legal advice
- Design: concept, basic, technical, construction drawings
- Permits: environment, fire safety, building permit
Project quotation
Quotation advice for your project in Hai Phong
Send the floor area and main requirements; an engineer will contact you with advice, a preliminary quotation and a schedule.
- Cost range by package: steel structure, envelope, foundations, MEP
- Preliminary schedule from design to handover
- Advice on the right contract model