Internal roads, drainage and kerbs: infrastructure works method
-
Site layout planning for factory construction
How World Steel lays out gates, temporary roads, storage yards, tower cranes, hoists, site offices and drainage so the site runs safely and on schedule.
Read the method
-
Preparing the site for the finishing phase
What must be in place before finishing works begin: area handover, reference lines, material hoisting, temporary power and water, housekeeping and safety.
Read the method
-
Internal roads, drainage and kerbs: infrastructure works method
The sequence for subgrade, granular base, concrete pavement, drainage pipes and kerbs inside the factory boundary, with the main acceptance points.
Read the method